Lencore Spectra i.Net: Installation and Operations Manual Manuale Utente Pagina 23

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 58
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 22
section 5
5.5 | wiring the speakers and i.Net® ops
First, run power cables to the IN/OUT connections of each i.Net OP,
taking care to be consistent with positive and negative screw terminals.
Do NOT cross positive and negative connections while wiring power- irreversible
damage will occur.
Run the power cables (NOT LIVE) from the power supply unit in the electrical/ IT
closet to the power +/- screw terminal connections of the first i.Net OP.
Complete all other wiring (audio and data) and perform wiring checklist
BEFORE powering up the system.
1
2
3
WARNING
NOTE: Make sure that grounds are connected to grounds and positives
to positives, and that wires are not crossed anywhere in the entire system.
Double check the wiring at each power supply.
Follow all labeling for power.
19
Vedere la pagina 22
1 2 ... 18 19 20 21 22 23 24 25 26 27 28 ... 57 58

Commenti su questo manuale

Nessun commento